This project consists of a new 187 room, six story hotel located in South San Francisco, CA. Flaherty Brothers Construction Installed a Fully-Adhered R-30 Tapered Insulation System with a ¼” Dens-Deck cover board & 60 Mil TPO Single-Ply System. In addition to the roof system, Flaherty Brothers Construction installed 8,000’ Sq/Ft of an acoustical ceiling system throughout the First floor lobby & Second floor meeting rooms.

The project consists of 238 units of wood framed Type V apartments that wrap around a 5-story, above grade parking structure. Flaherty Brothers Construction Installed a Mechanically attached ¼” Dens-Deck cover board & 60 Mil TPO Single-Ply System as well as a 4-Ply Title 24 compliant Built Up Roof System.

The project consists of 119 units of wood framed Type III apartments over 2 levels of above grade concrete and masonry parking structure. Flaherty Brothers Construction Installed a Mechanically attached ¼” Dens-Deck cover board & 60 Mil TPO Single-Ply System & a Garland Standing Seam Metal roof system at all sloped roofs.

The project consists of re-roofing (10) buildings in preparation of a (1) Mega-Watt Solar System installation. Flaherty Brothers Construction Installed a Mechanically attached 1/4” Dens-Deck cover board & 60 Mil TPO

The project consists of (105) units of wood framed Type V apartments over a concrete podium deck. Flaherty Brothers Construction installed 40,000' Sq/Ft of 60 Mil TPO Over 2' Rigid Insulation & 3/4' Dens-Deck. 37,000 Sq/Ft of GAF Composition Shingles & (28) Standing Seam Metal Awnings.

Under Construction
The project consists of a Six Story, (423) Unit rental apartment building with 5 Stories of wood-framed-construction rental apartments, above, (1) level of concrete-construction parking and office space, above (1) basement level of concrete-construction parking and retail space. Flaherty Brothers Construction installed 120,000' Sq/Ft of 60 Mil TPO Over 1' Rigid Insulation. 60 Mil TPO Self-Adhered Membrane @ All Walls.

Flaherty Brothers Construction Installed 40,000' Sq/Ft of Silicone Coating over the historical Golden State Fox Theater in Monterey, CA.

Flaherty Brothers Construction Installed 200,000' Sq/Ft of 60 Mil TPO Single-Ply over 1/4' Dens-Deck & 12,000' Sq/Ft of Standing Seam Metal roof systems.

Flaherty Brothers Construction Installed 55,000' Sq/Ft of 60 Mil TPO Single-Ply over 1/4' Dens-Deck.

This project consists of a new 193 room, seven story hotel located in San Jose, CA. Flaherty Brothers Construction Installed a 35,000' square foot Fully-Adhered R-30 Tapered Insulation System with a ¼” Dens-Deck cover board & 60 Mil TPO Single-Ply System.

Under Construction


-270,000' Sq/Ft
-2 Buildings

Walnut Ave Fremont, CA


-1/2' Insulation Board
-1/2' Cover Board
-60 mil TPO
-Mechanically Fastened

*Flaherty Brothers Construction overlaid 32,000' Sq/Ft of 60 Mil TPO Over 2' Rigid Insulation in (4) days.

Flaherty Brothers Construction Installed 15,000' Sq/Ft of Silicone Coating over a commercial office in San Carlos, CA.

Flaherty Brothers Construction installed a Fully-Adhered 4' Polyisocyanurate Insulation System and a 1/2' Dens-Deck cover board with a 50 Mil PVC Single-Ply roof system over a 55,000' Sq/Ft indoor volleyball facility.

San Jose, CA


-115,000' Sq/Ft

The project consists of two buildings and 301 units of wood framed Type III apartments over 2 levels of above grade concrete and masonry parking structure. Flaherty Brothers Construction Installed a Mechanically attached ¼” Dens-Deck fire rated cover board & 60 Mil GAF TPO Single-Ply System.

Under Construction


-Oakland, CA

The project consists of a 7 story building with 224 units of wood framed Type III apartments over retail. Flaherty Brothers Construction Installed a Mechanically attached R-30 tapered insulation system with ¼” Dens-Deck fire rated cover board & 60 Mil Fibertite KEE Single-Ply System.

Under Construction


-Concord, CA

Renaissance Apartments

This project is a new construction apartment building. It consists of (180) Apartment Units featuring a Five-Story at grade Apartment Building surrounding a Concrete Parking Structure. Apartments are to be wood-framed and will utilize post-tensioned thickened slabs for foundation support. The Concrete Parking Structure features a (5) Five tier parking structure with rooftop parking and an additional lower western Terrace, bike stalls are also available. Amenities include a clubhouse, wine and coffee bars, dog wash and business center. Flaherty Brothers Construction Installed 35,000' Sq/Ft of 1' fire rated cover board and 60 Mil Firestone TPO & 38,000' Sq/Ft of concrete Eagle S-Tile

Under Construction


-Concord, CA

Park Manor Apartments

Flaherty Brothers Construction tore off 10 buildings (50,000') Sq/Ft of existing cap-sheet roof systems and installed 1/2' Dens-Deck cover board & 60 Mil GAF TPO along with 15,000' Sq/Ft of Standing Seam roof awnings.


MENU